Our tech run went quite well considering it was the first time we had run our play in the theatre. There were clearly bits that still needed work, but I think that overall we did well. It was very hectic and nerve-racking to be doing a full run and trying to remember to include everything Jack had told us, as well as Stuart, the head of the technical department. It was amazing to see how the whole play looked with all of the lighting and sound and actually being able to work with our set for the first time.
Our run through was a bit messy and we all really needed to work on our voice and projection and keep the pace of the play up, but we were all really nervous. I feel like it went quite well though.
No comments:
Post a Comment